The
Kranji Expressway (
Abbreviation:
KJE) in
Singapore connects from the
BKE in
Bukit Panjang and travels south-west to join with the
PIE in
Jurong West. Construction of the expressway started in 1990 and was completed in 1994. The expressway is also the second shortest of all the expressways at about .