State Highway 99, also known as the
Grand Parkway, is a
Texas highway which opened its first section in 1994. When State Highway 99 is complete, it will be the longest beltway in the U.S., and the third (outer)
loop within
Houston–The Woodlands–Sugar Land metropolitan area, with
Interstate 610 being the first (inner) loop, and
Beltway 8 (Sam Houston Tollway) being the second (middle) loop. The proposed loop has been divided into 11 separate segments for construction and funding purposes. Only 3 of the 11 segments are complete. As of December 25, 2011, all segments except A have been fully funded.